Projects

Below a short photo documentation about realized projects without claim for completeness.

Please also read the description of individual projects:

SAG RichtfunkmastSAG Microwave radio relay pole SAG Microwave radio relay pole
This very deformation resistant microwave radio relay pole is used by the pole owner as well as by very many mobile telephony providers; this unit was re-constructed several times in order to meet the radio technical needs of the individual users. The pole is located in an extreme position and was statically designed for this situation.
Customer: Mobile telephony provider
Architekturprojekt mit SchüttbetonmauerArchitecture project with cast concrete wallArchitecture project with cast concrete wall
Instead of a natural stone panelling a cast concrete wall was selected with white-yellow up to 60mm large Omnia-grains; manufacture with injection process..
Tragstruktur einer Liftanlage Fa. Teccon DoppelmayrSupporting framework structure of a Doppelmayr-lift unitSupporting framework structure of a Doppelmayr-lift unit
Optimised construction framework structure for a lift unit in steel and steel concrete construction; the individual components were designed for adequate transport into an extreme location.
Customer: Company Teccon
Detaillierte Tragstruktur einer Liftanlage Fa.Teccon DoppelmayrDetailed supporting framework structure of a lift unit company Teccon Doppelmayr
Liftanlage im Finalzustand Fa.Teccon DoppelmayrLift unit in final condition Company Teccon Doppelmayr
Fussgängerbrücke Spittal Nord als Stahlfachwerkbrücke - Low-cost-VariantePedestrian bridge Spittal Nord as steel framework bridge - Low-cost-version
Fussgängerbrücke Spittal Nord - InnenansichtPedestrian bridge Spittal Nord - Inside view
HKW Salzburg Nord - IndustriebauHKW Salzburg North - Industrial construction
HTL Ferlach Tragwerksplanung für den StahlbetonbauHTL Ferlach Supporting framework planning for the steel concrete constructionHTL-Ferlach
Supporting framework planning for the steel concrete construction and steel construction.
Customer: BIG
Hallenzubau Fa. TecconHall extension Company TecconHall extension
Steel construction as framework construction with lower secondary support.
Customer: Company Teccon
Hallenzubau Fa. Teccon - DetailHall extension company Teccon - Detail
Kesselhaus Fenne IV - Bausituation vor hängendem KesseleinbauKesselhaus Fenne IV - Construction situation prior to hanging boiler installationKesselhaus Fenne IV
120m high boiler house in St52 with maximum loads up to 3000to.
Customer: Dt. Babcock
Kesselhausstütze Fenne IV - 440MW-BlockBoiler house support Fenne IV - 440MW-Block
Liftanlage Bergstation in der Montagephase Fa. TecconLift unit mountain station in the assembly phase Company Teccon
Tragstruktur einer Waschanlage Fa. TecconSupporting structure of a washing plant Company TecconMobile washing plant
Supporting structure of a mobile washing unit for military use in the Balkan region.
Customer: Teccon
Mobile Waschanlage Fa. TecconMobile washing unit Company Teccon
Pyramide im See als Tourismusprojekt - kaerntenkultPyramid in the sea as tourism project - kaerntenkultPyramid in the sea
Steel supporting structure pyramid-shaped supporting grid in the sea directly mounted on poles. The object is panelled with glass and a lightweight wood roof and therefore useable throughout the year as a tourism project; the exterior open areas without roof are floating devices.
Customer: kaerntenk
Zugangssteg Liftanlage Doppelmayr als Hohlkasten Fa. TecconAccess jetty lift unit Doppelmayr as box beam Company TecconAccess jetty Doppelmayr-Lift unit
Due to the special construction situation a torsion resistant box beam made of steel was installed; in order to minimize constraining forces a bearing towards static specifications was strived for.
Customer: Company Teccon
Zugangssteg Liftanlage Doppelmayr als Hohlkastenkonstruktion Fa. TecconAccess jetty lift unit Doppelmayr as box beam construction Company Teccon